Building the Terrace Pond Floating Walkway

buildingtheterracepondfloatingwalkway20.jpg

This shorter (4-foot) section of gangway being assembled. The frame is aluminum and came all welded into shape. Mike and Tamar have installed the decking, and are drilling and screwing it into the frame. They also assembled two 8-foot gangways for the ends of the walkway the same way.

Photo album created with Web Album Generator